|
| |
| | | | 1 | | | DO1.PCCNTR.2025441 ContractData Container |
| | | 1.1 | | | | | | | | | | 1,403,750.00 | 0.00 | 200,655.00 | 0.00 | 1,562,600.00 | 1,604,405.00 |
|
| | | | | | | 3 | | 72102602 - Instalación de(...)72102602 - Instalación de ventanas, puertas o dispositivos |
| 2.2.7.1.01 | SUMINISTRO E INSTALACION DE VERJA PERIMETRAL EN MALLA CICLONICA DE 6 PIES CON 4 LINEAS DE BLOCKS CON SUS RESPECTIVAS COLUMNAS CADA 6 METROS, INCLUYENDO MATERIALES GASTABLES PARA CPN VALDESIA | 170 | UD | 2,950 | 2,355 | 400,350.00 | | 0.00 | | 18 | 72,063.00 | | 0.00 | 501,500.00 | 472,413.00 | |
|
| | | | | | | 4 | | 72102602 - Instalación de(...)72102602 - Instalación de ventanas, puertas o dispositivos |
| 2.2.7.1.01 | MANTENIMIENTO DE 1 PUERTA VEHICULAR EN MALLA CICLONICA DE 5.00 X 1.20 MTS PARA EL CPN VALDESIA | 1 | UD | 41,300 | 30,000 | 30,000.00 | | 0.00 | | 18 | 5,400.00 | | 0.00 | 41,300.00 | 35,400.00 | |
|
| | | | | | | 5 | | 72102602 - Instalación de(...)72102602 - Instalación de ventanas, puertas o dispositivos |
| 2.2.7.1.01 | 1 PUERTA PEATONAL EN MALLA CICLONICA DE 1.00 X 120 MT PARA EL CPN VALDESIA | 1 | UD | 43,660 | 30,000 | 30,000.00 | | 0.00 | | 18 | 5,400.00 | | 0.00 | 43,660.00 | 35,400.00 | |
|
| | | | | | | 6 | | 72102602 - Instalación de(...)72102602 - Instalación de ventanas, puertas o dispositivos |
| 2.2.7.1.01 | SUMINISTRO E INSTALACION DE PUERTAS CON LLAVIN PARA EL CPN DE PALENQUE | 5 | UD | 18,408 | 15,500 | 77,500.00 | | 0.00 | | 18 | 13,950.00 | | 0.00 | 92,040.00 | 91,450.00 | |
|
| | | | | | | 7 | | 72101607 - Instalación o (...)72101607 - Instalación o reparación de paredes |
| 2.7.1.2.01 | BRILLADO DE 180 MT2 DE PISOS PARA EL CPN DE PALENQUE | 180 | UD | 295 | 130 | 23,400.00 | | 0.00 | | 18 | 4,212.00 | | 0.00 | 53,100.00 | 27,612.00 | |
|
| | | | | | | 8 | | 72101607 - Instalación o (...)72101607 - Instalación o reparación de paredes |
| 2.7.1.2.01 | SUMINISTRO E INSTALACION DE PLAFONES Y TRABAJO DE ILUMINACION CON LAMPARAS INCLUIDAS MAS LA ELECTICIDAD PARA EL CPN HATO DAMAS | 1 | UD | 123,900 | 123,000 | 123,000.00 | | 0.00 | | 18 | 22,140.00 | | 0.00 | 123,900.00 | 145,140.00 | |
|
| | | | | | | 9 | | 72101607 - Instalación o (...)72101607 - Instalación o reparación de paredes |
| 2.7.1.2.01 | SUMINISTRO E INSTALACION DE DIVISIONES DE PARED EN BLOCKS DE 6 PARA CPN HATO DAMAS | 75 | UD | 1,180 | 1,580 | 118,500.00 | | 0.00 | | 18 | 21,330.00 | | 0.00 | 88,500.00 | 139,830.00 | |
|
| | | | | | | 10 | | 72101607 - Instalación o (...)72101607 - Instalación o reparación de paredes |
| 2.7.1.2.01 | SUMINISTRO E INSTALACION DE DIVISIONES DE PARED EN BLOCKS DE 6 PARA CPN CALLE BONITA | 75 | UD | 1,180 | 1,580 | 118,500.00 | | 0.00 | | 18 | 21,330.00 | | 0.00 | 88,500.00 | 139,830.00 | |
|
| | | | | | | 11 | | 72101607 - Instalación o (...)72101607 - Instalación o reparación de paredes |
| 2.7.1.2.01 | SUMINISTRO E INSTALACION DE 150 MT2 DE PISOS PARA EL CPN SEMANA SANTA | 150 | UD | 1,534 | 1,290 | 193,500.00 | | 0.00 | | 18 | 34,830.00 | | 0.00 | 230,100.00 | 228,330.00 | |
|
| | | | | | | 12 | | 72101607 - Instalación o (...)72101607 - Instalación o reparación de paredes |
| 2.7.1.2.01 | MANO DE OBRA | 1 | UD | 300,000 | 289,000 | 289,000.00 | | 0.00 | | 0 | 0.00 | | 0.00 | 300,000.00 | 289,000.00 | |
|
|
| | | |
| | | |
|