|
| |
| | | | 1 | | | DO1.PCCNTR.1876635 ContractData Container |
| | | 1.1 | | | | | | | | | | 66,790,831.10 | 0.00 | 14,661,401.96 | 0.00 | 90,300,000.00 | 81,452,233.06 |
|
| | | | | | | 1 | | 30222204 - Depósito eleva(...)30222204 - Depósito elevado de agua |
| 2.7.2.1.01 | “CONSTRUCCION ACUEDUCTO MULTIPLE PUJADOR (OBRA DE TOMA, LINEA DE ADUCCION, ESTACIONES DE BOMBEO, DEPOSITOS REGULADORES SUPERFICIALES 600 M3 Y 150 M3 C/U CON SU VERJA PERIMETRAL EN BLOQUE Y LINEA DE IMPULSION), PROVINCIA MARIA TRINIDAD SANCHEZ, ZONA III, SNIP 14651” | 1 | UD | 90,300,000 | 66,790,831.1 | 66,790,831.10 | 0 | 0.00 | 81,452,233.1 | 18 | 14,661,401.96 | 0 | 0.00 | 90,300,000.00 | 81,452,233.06 | |
|
|
| | | |
| | | |
|