| | | | 1 | | | DO1.PCCNTR.1822118 ContractData Container |
| | | 1.1 | | | | | | | | | | 1,046,863.30 | 0.00 | 188,435.39 | 0.00 | 1,049,284.30 | 1,235,298.69 |
|
| | | | | | | 1 | | 2.3.6.1.04 | SUMINISTRO Y COLOCACION DE SHEETROCK Y PLAFON | 56 | M2 | 2,935 | 2,935 | 164,360.00 | | 0.00 | | 18 | 29,584.80 | | 0.00 | 164,360.00 | 193,944.80 | |
|
| | | | | | | 2 | | 30161706 - Pisos de baldo(...)30161706 - Pisos de baldosa o piedra |
| 2.3.6.2.02 | SUMINSTRO Y COLOCACION DE PISO EN PVC | 32.75 | M2 | 3,934 | 3,934 | 128,838.50 | | 0.00 | | 18 | 23,190.93 | | 0.00 | 128,838.50 | 152,029.43 | |
|
| | | | | | | 3 | | 32141107 - Zócalos de tub(...)32141107 - Zócalos de tubo |
| 2.3.9.6.01 | SUMINISTRO Y COLOCACION DE ZOCALOS DE PISO EN MADERA | 23.82 | M2 | 1,890 | 1,890 | 45,019.80 | | 0.00 | | 18 | 8,103.56 | | 0.00 | 45,019.80 | 53,123.36 | |
|
| | | | | | | 4 | | 2.3.6.4.04 | SUMINISTRO Y COLOCACION DE PAÑOS EN P-40 COLOR PLATA | 269 | UD | 1,069 | 1,060 | 285,140.00 | | 0.00 | | 18 | 51,325.20 | | 0.00 | 287,561.00 | 336,465.20 | |
|
| | | | | | | 5 | | 32101503 - Conjuntos de c(...)32101503 - Conjuntos de circuitos mixtos |
| 2.3.9.6.01 | SUMINSTRO Y COLOCACION DE SALIDAS ELECTRICAS Y DATA | 48 | PAQ | 1,235 | 1,235 | 59,280.00 | | 0.00 | | 18 | 10,670.40 | | 0.00 | 59,280.00 | 69,950.40 | |
|
| | | | | | | 6 | | 30171508 - Puertas corred(...)30171508 - Puertas corrediza empotrable |
| 2.3.9.8.02 | SUMINISTRO Y COLOCACION DE PUERTA COMERCIALES | 3 | UD | 38,500 | 38,500 | 115,500.00 | | 0.00 | | 18 | 20,790.00 | | 0.00 | 115,500.00 | 136,290.00 | |
|
| | | | | | | 7 | | 30161706 - Pisos de baldo(...)30161706 - Pisos de baldosa o piedra |
| 2.3.6.2.02 | DEMOLICION EN PISO PARA COLOCACION DE TUBERIAS | 1 | PAQ | 57,800 | 57,800 | 57,800.00 | | 0.00 | | 18 | 10,404.00 | | 0.00 | 57,800.00 | 68,204.00 | |
|
| | | | | | | 8 | | 30161706 - Pisos de baldo(...)30161706 - Pisos de baldosa o piedra |
| 2.3.6.2.02 | SELLADO DE PISO PARA COLOCAR PISO DE PVC | 1 | PAQ | 25,800 | 25,800 | 25,800.00 | | 0.00 | | 18 | 4,644.00 | | 0.00 | 25,800.00 | 30,444.00 | |
|
| | | | | | | 9 | | 39101605 - Lámparas fluor(...)39101605 - Lámparas fluorescentes |
| 2.3.9.6.01 | SUMINISTRO Y COLOCACION DE LAMPARAS ELECTRICA CON CABLEADO | 6 | UD | 8,900 | 8,900 | 53,400.00 | | 0.00 | | 18 | 9,612.00 | | 0.00 | 53,400.00 | 63,012.00 | |
|
| | | | | | | 10 | | 31211501 - Pinturas de es(...)31211501 - Pinturas de esmalte |
| 2.3.7.2.06 | SUMINISTRO Y COLOCACION DE PINTURA | 80.5 | M2 | 250 | 250 | 20,125.00 | | 0.00 | | 18 | 3,622.50 | | 0.00 | 20,125.00 | 23,747.50 | |
|
| | | | | | | 11 | | 31211501 - Pinturas de es(...)31211501 - Pinturas de esmalte |
| 2.3.7.2.06 | LIMPIEZA CONTINUA FINAL | 1 | PAQ | 45,600 | 45,600 | 45,600.00 | | 0.00 | | 18 | 8,208.00 | | 0.00 | 45,600.00 | 53,808.00 | |
|
| | | | | | | 12 | | 31211501 - Pinturas de es(...)31211501 - Pinturas de esmalte |
| 2.3.7.2.06 | BOTE DE ESCOMBRO Y DESPERDICIOS | 10 | UD | 4,600 | 4,600 | 46,000.00 | | 0.00 | | 18 | 8,280.00 | | 0.00 | 46,000.00 | 54,280.00 | |
|
|
| | | |
| | | |
|