|
| |
| | | | 1 | | | DO1.PCCNTR.1663959 ContractData Container |
| | | 1.1 | | | | | | | | | | 72,618.46 | 0.00 | 13,071.34 | 0.00 | 85,689.78 | 85,689.80 |
|
| | | | | | | 1 | | 30102215 - Placa de plást(...)30102215 - Placa de plástico |
| 2.3.5.5.01 | Plancha de poliurentano p-3 | 5 | UD | 4,799.99 | 4,067.79 | 20,338.95 | | 0.00 | | 18 | 3,661.01 | | 0.00 | 23,999.95 | 23,999.96 | |
|
| | | | | | | 2 | | 40101505 - Difusores de a(...)40101505 - Difusores de aire |
| 2.3.9.8.01 | Difusor fijo 12x12 | 9 | UD | 1,349.99 | 1,144.06 | 10,296.54 | | 0.00 | | 18 | 1,853.38 | | 0.00 | 12,149.91 | 12,149.92 | |
|
| | | | | | | 3 | | 30103206 - Rejilla de plá(...)30103206 - Rejilla de plástico |
| 2.3.5.5.01 | Rejilla plastica 2x4 | 1 | UD | 900.04 | 762.71 | 762.71 | | 0.00 | | 18 | 137.29 | | 0.00 | 900.04 | 900.00 | |
|
| | | | | | | 4 | | 40161505 - Filtros de air(...)40161505 - Filtros de aire |
| 2.3.9.8.01 | Filtro vegetal | 4 | FT | 299.99 | 254.23 | 1,016.92 | | 0.00 | | 18 | 183.05 | | 0.00 | 1,199.96 | 1,199.97 | |
|
| | | | | | | 5 | | 31201501 - Cinta de ducto(...)31201501 - Cinta de ductos |
| 2.3.9.9.05 | Cinta ductape 3x6 | 2 | UD | 799.99 | 677.96 | 1,355.92 | | 0.00 | | 18 | 244.07 | | 0.00 | 1,599.98 | 1,599.99 | |
|
| | | | | | | 6 | | 40141914 - Conductos o re(...)40141914 - Conductos o red de conductos de plástico |
| 2.3.6.3.04 | Ducto flexible de 8 | 4 | UD | 3,199.99 | 2,711.86 | 10,847.44 | | 0.00 | | 18 | 1,952.54 | | 0.00 | 12,799.96 | 12,799.98 | |
|
| | | | | | | 7 | | 40141914 - Conductos o re(...)40141914 - Conductos o red de conductos de plástico |
| 2.3.6.3.04 | Ducto flexible de 10 | 2 | UD | 3,799.99 | 3,220.33 | 6,440.66 | | 0.00 | | 18 | 1,159.32 | | 0.00 | 7,599.98 | 7,599.98 | |
|
| | | | | | | 8 | | 12163501 - Sellantes de c(...)12163501 - Sellantes de cemento |
| 2.3.7.2.99 | Galón de cemento p3 | 1 | GAL | 4,200 | 3,559.32 | 3,559.32 | | 0.00 | | 18 | 640.68 | | 0.00 | 4,200.00 | 4,200.00 | |
|
| | | | | | | 9 | | 72101606 - Instalación de(...)72101606 - Instalación de conductos |
| 2.2.7.1.01 | Servicio mano de obra confencion de ducteria | 1 | UD | 21,240 | 18,000 | 18,000.00 | | 0.00 | | 18 | 3,240.00 | | 0.00 | 21,240.00 | 21,240.00 | |
|
|
| | | |
| | | |
|