| | | | 1 | | | DO1.PCCNTR.892502 ContractData Container |
| | | 1.1 | | | | | | | | | | 3,807,226.69 | 0.00 | 685,300.80 | 0.00 | 3,807,239.18 | 4,492,527.49 |
|
| | | | | | | 1 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Mano de Obra de Pintura | 59.13 | UD | 280.8 | 280.8 | 16,603.70 | | 0.00 | | 18 | 2,988.67 | | 0.00 | 16,603.70 | 19,592.37 | |
|
| | | | | | | 2 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Mano de Obra de Pintura | 64.85 | UD | 280.8 | 280.8 | 18,209.88 | | 0.00 | | 18 | 3,277.78 | | 0.00 | 18,209.88 | 21,487.66 | |
|
| | | | | | | 3 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Enmarcado e instalacion de Cuadro de Escudo | 1 | UD | 16,540 | 16,527.5 | 16,527.50 | | 0.00 | | 18 | 2,974.95 | | 0.00 | 16,540.00 | 19,502.45 | |
|
| | | | | | | 4 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Revestimiento de Plafond Central Pieza central de 1.2Mts de ancho (mas bajo) con melamina - Confección e Instalación | 7.2 | UD | 10,389.6 | 10,389.6 | 74,805.12 | | 0.00 | | 18 | 13,464.92 | | 0.00 | 74,805.12 | 88,270.04 | |
|
| | | | | | | 5 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Revestimiento en Melamina en Espacio central de Pared detrás de Escritorio hasta altura de Puerta - Confección e Instalación | 8.64 | UD | 10,108.8 | 10,108.8 | 87,340.03 | | 0.00 | | 18 | 15,721.21 | | 0.00 | 87,340.03 | 103,061.24 | |
|
| | | | | | | 6 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Revestimiento en Melamina de tono parecido al revestimiento acústico en Paredes Laterales (Paredes con puertas) hasta altura de Puerta - Confección e Instalación | 43.66 | UD | 10,108.8 | 10,108.8 | 441,350.21 | | 0.00 | | 18 | 79,443.04 | | 0.00 | 441,350.21 | 520,793.25 | |
|
| | | | | | | 7 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Revestimiento en Melamina en fondo de tope de Lavamanso - Confección e Instalación | 1 | UD | 36,391.68 | 36,391.68 | 36,391.68 | | 0.00 | | 18 | 6,550.50 | | 0.00 | 36,391.68 | 42,942.18 | |
|
| | | | | | | 8 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Revestimientos de Cuerpo Central atrás de espaldar cama tipo bousserie con paneles de maderitas a los laterales - Confección e Instalación | 21.6 | UD | 10,108.8 | 10,108.8 | 218,350.08 | | 0.00 | | 18 | 39,303.01 | | 0.00 | 218,350.08 | 257,653.09 | |
|
| | | | | | | 9 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Revestimiento en Melamina en Paredes Laterales (en resto de pared) - Confección e Instalación | 24.77 | UD | 10,108.8 | 10,108.8 | 250,394.98 | | 0.00 | | 18 | 45,071.10 | | 0.00 | 250,394.98 | 295,466.07 | |
|
| | | | | | | 10 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Revestimiento en melamina de Fronton en Televisiones - Confección e instalación | 15 | UD | 10,389.6 | 10,389.6 | 155,844.00 | | 0.00 | | 18 | 28,051.92 | | 0.00 | 155,844.00 | 183,895.92 | |
|
| | | | | | | 11 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Revestimiento de Pared hacia entrada oficina Ministro - Confección e Instalación | 14.07 | UD | 10,108.8 | 10,108.8 | 142,230.82 | | 0.00 | | 18 | 25,601.55 | | 0.00 | 142,230.82 | 167,832.36 | |
|
| | | | | | | 12 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Revestimiento de Plafond Central (mas alto) con melamina - Confección e Instalación | 16.24 | UD | 10,389.6 | 10,389.6 | 168,727.10 | | 0.00 | | 18 | 30,370.88 | | 0.00 | 168,727.10 | 199,097.98 | |
|
| | | | | | | 13 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Revestimiento en Melamina en Espacio central de Pared detrás de Escritorio - Confección e Instalación | 15.33 | UD | 10,108.8 | 10,108.8 | 154,967.90 | | 0.00 | | 18 | 27,894.22 | | 0.00 | 154,967.90 | 182,862.13 | |
|
| | | | | | | 14 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Revestimiento en Melamina en fondo de tope de Lavamanos - Confección e Instalación | 1 | UD | 36,391.68 | 36,391.68 | 36,391.68 | | 0.00 | | 18 | 6,550.50 | | 0.00 | 36,391.68 | 42,942.18 | |
|
| | | | | | | 15 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Raffias naturales con tarro inteligente | 2 | UD | 12,369 | 12,369 | 24,738.00 | | 0.00 | | 18 | 4,452.84 | | 0.00 | 24,738.00 | 29,190.84 | |
|
| | | | | | | 16 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Raffia Artificial con Tarro | 1 | UD | 28,215.33 | 28,215.33 | 28,215.33 | | 0.00 | | 18 | 5,078.76 | | 0.00 | 28,215.33 | 33,294.09 | |
|
| | | | | | | 17 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Confeccion e instalacion de molduras en madera a altura de 0.90m teñidas en color madera | 13.6 | UD | 4,550 | 4,550 | 61,880.00 | | 0.00 | | 18 | 11,138.40 | | 0.00 | 61,880.00 | 73,018.40 | |
|
| | | | | | | 18 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Papel Frost en división de vidrio - Mano de Obra y Materiales | 43.8 | UD | 491.4 | 491.4 | 21,523.32 | | 0.00 | | 18 | 3,874.20 | | 0.00 | 21,523.32 | 25,397.52 | |
|
| | | | | | | 19 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Papel Frost en división de vidrio Sala Estar - Mano de Obra y Materiales | 34.14 | UD | 491.4 | 491.4 | 16,776.40 | | 0.00 | | 18 | 3,019.75 | | 0.00 | 16,776.40 | 19,796.15 | |
|
| | | | | | | 20 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Suministro e Instalación papel tapiz | 4 | UD | 5,500 | 5,500 | 22,000.00 | | 0.00 | | 18 | 3,960.00 | | 0.00 | 22,000.00 | 25,960.00 | |
|
| | | | | | | 21 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Papel tapiz Para Pared detrás de Counter - Compra e Instalación | 6 | UD | 7,020 | 7,020 | 42,120.00 | | 0.00 | | 18 | 7,581.60 | | 0.00 | 42,120.00 | 49,701.60 | |
|
| | | | | | | 22 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Papel frost en división de vidrio Recepción/Hall - Mano de Obra y Materiales | 47.7 | UD | 491.4 | 491.4 | 23,439.78 | | 0.00 | | 18 | 4,219.16 | | 0.00 | 23,439.78 | 27,658.94 | |
|
| | | | | | | 23 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Papel tapiz debajo de moldura en Pared de Butacas - Compra e Instalación | 3 | UD | 7,020 | 7,020 | 21,060.00 | | 0.00 | | 18 | 3,790.80 | | 0.00 | 21,060.00 | 24,850.80 | |
|
| | | | | | | 24 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Papel Frost en Puerta hacia sala de Espera - Mano de Obra y Materiales | 14.76 | UD | 491.4 | 491.4 | 7,253.06 | | 0.00 | | 18 | 1,305.55 | | 0.00 | 7,253.06 | 8,558.62 | |
|
| | | | | | | 25 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Suministro e instalacion de Papel tapiz para pared frente a recepción entrada a sala de espera | 2 | UD | 7,020 | 7,020 | 14,040.00 | | 0.00 | | 18 | 2,527.20 | | 0.00 | 14,040.00 | 16,567.20 | |
|
| | | | | | | 26 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Papel tapiz sobre Moldura en Paredes Laterales - Compra e Instalación | 8 | UD | 7,020 | 7,020 | 56,160.00 | | 0.00 | | 18 | 10,108.80 | | 0.00 | 56,160.00 | 66,268.80 | |
|
| | | | | | | 27 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Papel tapiz en Pared frente a Escritorio - Compra e Instalación | 7 | UD | 7,020 | 7,020 | 49,140.00 | | 0.00 | | 18 | 8,845.20 | | 0.00 | 49,140.00 | 57,985.20 | |
|
| | | | | | | 28 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Suministro e instalacion papel tapiz | 4 | UD | 6,500 | 6,500 | 26,000.00 | | 0.00 | | 18 | 4,680.00 | | 0.00 | 26,000.00 | 30,680.00 | |
|
| | | | | | | 29 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Suministro e Instalación papel tapiz | 4 | UD | 6,500 | 6,500 | 26,000.00 | | 0.00 | | 18 | 4,680.00 | | 0.00 | 26,000.00 | 30,680.00 | |
|
| | | | | | | 30 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Espejo sobre Mesa Parson | 1 | UD | 56,160 | 56,160 | 56,160.00 | | 0.00 | | 18 | 10,108.80 | | 0.00 | 56,160.00 | 66,268.80 | |
|
| | | | | | | 31 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Espejo encima de dresser | 1 | UD | 48,805 | 48,805 | 48,805.00 | | 0.00 | | 18 | 8,784.90 | | 0.00 | 48,805.00 | 57,589.90 | |
|
| | | | | | | 32 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Estructura para enganche de paneles en pared de television | 15 | UD | 5,194.8 | 5,194.8 | 77,922.00 | | 0.00 | | 18 | 14,025.96 | | 0.00 | 77,922.00 | 91,947.96 | |
|
| | | | | | | 33 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Aplique de Pared | 1 | UD | 42,120 | 42,120 | 42,120.00 | | 0.00 | | 18 | 7,581.60 | | 0.00 | 42,120.00 | 49,701.60 | |
|
| | | | | | | 34 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | 4 brazos soporte de pantallas | 4 | UD | 4,800 | 4,800 | 19,200.00 | | 0.00 | | 18 | 3,456.00 | | 0.00 | 19,200.00 | 22,656.00 | |
|
| | | | | | | 35 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Moldura horizontal en Paredes Laterales - Confección e Instalación | 13.1 | UD | 3,650.4 | 3,650.4 | 47,820.24 | | 0.00 | | 18 | 8,607.64 | | 0.00 | 47,820.24 | 56,427.88 | |
|
| | | | | | | 36 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Suministro de Pintura | 5 | UD | 1,755 | 1,755 | 8,775.00 | | 0.00 | | 18 | 1,579.50 | | 0.00 | 8,775.00 | 10,354.50 | |
|
| | | | | | | 37 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Suministro de Pintura | 6 | UD | 1,755 | 1,755 | 10,530.00 | | 0.00 | | 18 | 1,895.40 | | 0.00 | 10,530.00 | 12,425.40 | |
|
| | | | | | | 38 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Pintura sobre Paneles y Pared (frente a escritorio) - Compra de Materiales | 5 | UD | 1,755 | 1,755 | 8,775.00 | | 0.00 | | 18 | 1,579.50 | | 0.00 | 8,775.00 | 10,354.50 | |
|
| | | | | | | 39 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Pintura sobre Paneles y Pared (frente a escritorio) - Mano de Obra | 58.37 | UD | 280.8 | 280.8 | 16,390.30 | | 0.00 | | 18 | 2,950.25 | | 0.00 | 16,390.30 | 19,340.55 | |
|
| | | | | | | 40 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Pintura de Pared en ambos laterales de Panel de Tv color a elegir - Compra de Materiales | 6 | UD | 1,755 | 1,755 | 10,530.00 | | 0.00 | | 18 | 1,895.40 | | 0.00 | 10,530.00 | 12,425.40 | |
|
| | | | | | | 41 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Pintura de Pared en ambos laterales de Panel de Tv color a elegir - Mano de Obra | 53.33 | UD | 280.8 | 280.8 | 14,975.06 | | 0.00 | | 18 | 2,695.51 | | 0.00 | 14,975.06 | 17,670.58 | |
|
| | | | | | | 42 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Pintura en pared Sala hab. Secundarias - compra de material | 6.5 | UD | 1,755 | 1,755 | 11,407.50 | | 0.00 | | 18 | 2,053.35 | | 0.00 | 11,407.50 | 13,460.85 | |
|
| | | | | | | 43 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Pintura en pared Sala hab.secundarias - mano de obra | 79.5 | UD | 280.8 | 280.8 | 22,323.60 | | 0.00 | | 18 | 4,018.25 | | 0.00 | 22,323.60 | 26,341.85 | |
|
| | | | | | | 44 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Pintura por encima de paneles de melamina - Compra de materiales | 6 | UD | 1,755 | 1,755 | 10,530.00 | | 0.00 | | 18 | 1,895.40 | | 0.00 | 10,530.00 | 12,425.40 | |
|
| | | | | | | 45 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Pintura por encima de paneles de melamina - Mano de obra | 64.84 | UD | 280.8 | 280.8 | 18,207.07 | | 0.00 | | 18 | 3,277.27 | | 0.00 | 18,207.07 | 21,484.34 | |
|
| | | | | | | 46 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Pintura detrás de sofa en volumen central - Compra de Materiales | 6.5 | UD | 1,755 | 1,755 | 11,407.50 | | 0.00 | | 18 | 2,053.35 | | 0.00 | 11,407.50 | 13,460.85 | |
|
| | | | | | | 47 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Pintura detrás de sofa en volumen central - Mano de Obra | 63.84 | UD | 280.8 | 280.8 | 17,926.27 | | 0.00 | | 18 | 3,226.73 | | 0.00 | 17,926.27 | 21,153.00 | |
|
| | | | | | | 48 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Suministro de Pintura Graffito sin olor | 9 | UD | 1,755 | 1,755 | 15,795.00 | | 0.00 | | 18 | 2,843.10 | | 0.00 | 15,795.00 | 18,638.10 | |
|
| | | | | | | 49 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Pintura por encima de molduras - Compra de materiales | 2 | UD | 1,755 | 1,755 | 3,510.00 | | 0.00 | | 18 | 631.80 | | 0.00 | 3,510.00 | 4,141.80 | |
|
| | | | | | | 50 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Pintura por encima de Molduras - Mano de Obra | 35.36 | UD | 280.8 | 280.8 | 9,929.09 | | 0.00 | | 18 | 1,787.24 | | 0.00 | 9,929.09 | 11,716.32 | |
|
| | | | | | | 51 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Pintura por encima de molduras - Compra de materiales | 4 | UD | 1,755 | 1,755 | 7,020.00 | | 0.00 | | 18 | 1,263.60 | | 0.00 | 7,020.00 | 8,283.60 | |
|
| | | | | | | 52 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Pintura por encima de Molduras - Mano de Obra | 45.1 | UD | 280.8 | 280.8 | 12,664.08 | | 0.00 | | 18 | 2,279.53 | | 0.00 | 12,664.08 | 14,943.61 | |
|
| | | | | | | 53 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Accesorios de Baño (Bandeja para toallas, toallas, hamper toallas, zafacon) | 1 | UD | 4,844 | 4,844 | 4,844.00 | | 0.00 | | 18 | 871.92 | | 0.00 | 4,844.00 | 5,715.92 | |
|
| | | | | | | 54 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Accesorios de Baño (Incluye: Zafacon, Portatoallas de mano, 6 uds de Toallas de Mano, Cesto de toallas, toalla de baño bordado logo) | 1 | UD | 35,100 | 35,100 | 35,100.00 | | 0.00 | | 18 | 6,318.00 | | 0.00 | 35,100.00 | 41,418.00 | |
|
| | | | | | | 55 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Accesorios de Baño (Bandeja para toallas y servilletas, jabonera de tope, toallas y servilletas, ambientador, zafacon) | 1 | UD | 35,100 | 35,100 | 35,100.00 | | 0.00 | | 18 | 6,318.00 | | 0.00 | 35,100.00 | 41,418.00 | |
|
| | | | | | | 56 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Accesorios de Baño (Bandeja para toallas y servilletas, jabonera de tope, toallas y servilletas, ambientador,zafacon) | 1 | UD | 35,100 | 35,100 | 35,100.00 | | 0.00 | | 18 | 6,318.00 | | 0.00 | 35,100.00 | 41,418.00 | |
|
| | | | | | | 57 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Accesorios de Baño (Incluye: Zafacon, Portatoallas de mano, 6 uds de Toallas de Mano, Cesto de toallas, toalla de baño bordado logo) | 2 | UD | 8,344 | 8,344 | 16,688.00 | | 0.00 | | 18 | 3,003.84 | | 0.00 | 16,688.00 | 19,691.84 | |
|
| | | | | | | 58 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Accesorios de Baño (Bandeja para toallas y servilletas, jabonera de tope, servilletas, ambientador) | 1 | UD | 35,100 | 35,100 | 35,100.00 | | 0.00 | | 18 | 6,318.00 | | 0.00 | 35,100.00 | 41,418.00 | |
|
| | | | | | | 59 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Lámparas de Superficie circulares para Plafond Central - Compra e Instalación | 3 | UD | 15,724.8 | 15,724.8 | 47,174.40 | | 0.00 | | 18 | 8,491.39 | | 0.00 | 47,174.40 | 55,665.79 | |
|
| | | | | | | 60 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Lampara de Mesa para mesistas de noche | 2 | UD | 39,312 | 39,312 | 78,624.00 | | 0.00 | | 18 | 14,152.32 | | 0.00 | 78,624.00 | 92,776.32 | |
|
| | | | | | | 61 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Lampara de Mesa de Noche | 1 | UD | 29,060 | 29,060 | 29,060.00 | | 0.00 | | 18 | 5,230.80 | | 0.00 | 29,060.00 | 34,290.80 | |
|
| | | | | | | 62 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Lampara de Mesa para mesistas de noche - Compra | 2 | UD | 23,868 | 23,868 | 47,736.00 | | 0.00 | | 18 | 8,592.48 | | 0.00 | 47,736.00 | 56,328.48 | |
|
| | | | | | | 63 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Lámparas de Superficie circulares para Plafond Central - Compra e Instalación | 2 | UD | 17,550 | 17,550 | 35,100.00 | | 0.00 | | 18 | 6,318.00 | | 0.00 | 35,100.00 | 41,418.00 | |
|
| | | | | | | 64 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Lamparas para Mesas de noche | 2 | UD | 18,656 | 18,656 | 37,312.00 | | 0.00 | | 18 | 6,716.16 | | 0.00 | 37,312.00 | 44,028.16 | |
|
| | | | | | | 65 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Articulos decorativos | 1 | UD | 49,140 | 49,140 | 49,140.00 | | 0.00 | | 18 | 8,845.20 | | 0.00 | 49,140.00 | 57,985.20 | |
|
| | | | | | | 66 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Adornos decorativos para mesas y escritorio | 1 | UD | 134,160 | 134,160 | 134,160.00 | | 0.00 | | 18 | 24,148.80 | | 0.00 | 134,160.00 | 158,308.80 | |
|
| | | | | | | 67 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Adornos Varios | 1 | UD | 70,200 | 70,200 | 70,200.00 | | 0.00 | | 18 | 12,636.00 | | 0.00 | 70,200.00 | 82,836.00 | |
|
| | | | | | | 68 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Adornos para credenza y mesa lateral | 1 | UD | 44,928 | 44,928 | 44,928.00 | | 0.00 | | 18 | 8,087.04 | | 0.00 | 44,928.00 | 53,015.04 | |
|
| | | | | | | 69 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Adornos varios | 1 | UD | 62,140 | 62,140 | 62,140.00 | | 0.00 | | 18 | 11,185.20 | | 0.00 | 62,140.00 | 73,325.20 | |
|
| | | | | | | 70 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Adornos varios | 1 | UD | 35,100 | 35,100 | 35,100.00 | | 0.00 | | 18 | 6,318.00 | | 0.00 | 35,100.00 | 41,418.00 | |
|
| | | | | | | 71 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Adornos varios | 1 | UD | 14,869 | 14,869 | 14,869.00 | | 0.00 | | 18 | 2,676.42 | | 0.00 | 14,869.00 | 17,545.42 | |
|
| | | | | | | 72 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Adornos varios | 1 | UD | 10,660 | 10,660 | 10,660.00 | | 0.00 | | 18 | 1,918.80 | | 0.00 | 10,660.00 | 12,578.80 | |
|
| | | | | | | 73 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Cambio de marco a cuadro suministrado | 1 | UD | 8,800 | 8,800 | 8,800.00 | | 0.00 | | 18 | 1,584.00 | | 0.00 | 8,800.00 | 10,384.00 | |
|
| | | | | | | 74 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Suministro e instalacion de Cuadro sobre sofa | 2 | UD | 49,140 | 49,140 | 98,280.00 | | 0.00 | | 18 | 17,690.40 | | 0.00 | 98,280.00 | 115,970.40 | |
|
| | | | | | | 75 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Adornos varios | 1 | UD | 14,560 | 14,560 | 14,560.00 | | 0.00 | | 18 | 2,620.80 | | 0.00 | 14,560.00 | 17,180.80 | |
|
| | | | | | | 76 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Adornos decorativos para mesas | 1 | UD | 21,320 | 21,320 | 21,320.00 | | 0.00 | | 18 | 3,837.60 | | 0.00 | 21,320.00 | 25,157.60 | |
|
| | | | | | | 77 | | 24121802 - Latas de pintu(...)24121802 - Latas de pintura o barniz |
| 2.3.6.3.05 | Adornos Varios | 1 | UD | 44,928 | 44,928 | 44,928.00 | | 0.00 | | 18 | 8,087.04 | | 0.00 | 44,928.00 | 53,015.04 | |
|
|
| | | |
| | | |
|