| | | | 1 | | | DO1.PCCNTR.837228 ContractData Container |
| | | 1.1 | | | | | | | | | | 814,255.00 | 0.00 | 146,565.90 | 0.00 | 877,091.75 | 960,820.90 |
|
| | | | | | | 1 | | 81101501 - Ingeniería de (...)81101501 - Ingeniería de pozos |
| 2.2.8.7.01 | SUMINISTRO TUBERIA Ø12"ACERO, E=1/4" | 218 | FT | 1,326 | 1,250 | 272,500.00 | | 0.00 | | 18 | 49,050.00 | | 0.00 | 289,068.00 | 321,550.00 | |
|
| | | | | | | 2 | | 81101501 - Ingeniería de (...)81101501 - Ingeniería de pozos |
| 2.2.8.7.01 | ENCAMISADO Ø12” ACERO | 218 | FT | 250 | 200 | 43,600.00 | | 0.00 | | 18 | 7,848.00 | | 0.00 | 54,500.00 | 51,448.00 | |
|
| | | | | | | 3 | | 81101501 - Ingeniería de (...)81101501 - Ingeniería de pozos |
| 2.2.8.7.01 | RANURADOS | 150 | FT | 150 | 150 | 22,500.00 | | 0.00 | | 18 | 4,050.00 | | 0.00 | 22,500.00 | 26,550.00 | |
|
| | | | | | | 4 | | 81101501 - Ingeniería de (...)81101501 - Ingeniería de pozos |
| 2.2.8.7.01 | SUMINISTRO Y COLOCACION DE GRAVA DE 1/2" A 3/8" (GRAVA CLASIFICADA SEGUN ESPECIFICACIONES TECNICAS) | 4.25 | M3 | 6,315 | 5,000 | 21,250.00 | | 0.00 | | 18 | 3,825.00 | | 0.00 | 26,838.75 | 25,075.00 | |
|
| | | | | | | 5 | | 81101501 - Ingeniería de (...)81101501 - Ingeniería de pozos |
| 2.2.8.7.01 | SUMINISTRO Y COLOCACION DE TELA SARAN( 50.00 X 1.00)M, (ROLLO) | 5 | UN | 3,821 | 3,821 | 19,105.00 | | 0.00 | | 18 | 3,438.90 | | 0.00 | 19,105.00 | 22,543.90 | |
|
| | | | | | | 6 | | 81101501 - Ingeniería de (...)81101501 - Ingeniería de pozos |
| 2.2.8.7.01 | TAIROD PARA SUJETAR TELA SARAN | 100 | UN | 3.8 | 3 | 300.00 | | 0.00 | | 18 | 54.00 | | 0.00 | 380.00 | 354.00 | |
|
| | | | | | | 7 | | 71121022 - Servicios de l(...)71121022 - Servicios de limpieza del pozo |
| 2.2.8.5.03 | LIMPIEZAS Y DESARROLLO POR PISTONEO DE POZOS. | 2 | UN | 44,900 | 45,000 | 90,000.00 | | 0.00 | | 18 | 16,200.00 | | 0.00 | 89,800.00 | 106,200.00 | |
|
| | | | | | | 8 | | 81101501 - Ingeniería de (...)81101501 - Ingeniería de pozos |
| 2.2.8.7.01 | AFORO (24 HORAS) >300gpm | 2 | UN | 110,000 | 90,000 | 180,000.00 | | 0.00 | | 18 | 32,400.00 | | 0.00 | 220,000.00 | 212,400.00 | |
|
| | | | | | | 9 | | 71121022 - Servicios de l(...)71121022 - Servicios de limpieza del pozo |
| 2.2.8.5.03 | LIMPIEZAS Y DESARROLLO POR PISTONEO DE POZOS. | 1 | UN | 44,900 | 45,000 | 45,000.00 | | 0.00 | | 18 | 8,100.00 | | 0.00 | 44,900.00 | 53,100.00 | |
|
| | | | | | | 10 | | 81101501 - Ingeniería de (...)81101501 - Ingeniería de pozos |
| 2.2.8.7.01 | PUERBA DE AFORO. (24 horas) >300 gpm, Prof.>300 pies | 1 | UN | 110,000 | 120,000 | 120,000.00 | | 0.00 | | 18 | 21,600.00 | | 0.00 | 110,000.00 | 141,600.00 | |
|
|
| | | |
| | | |
|